New Project Awards

October 1, 2026
Multiple Award Indefinite Delivery, Indefinite Quantity (IDIQ) Contract for General Construction Services in the East Coast Corridor
gsa.jpg
General Services Administration (GSA)
Mid-Atlantic Region

SEG is proud to continue expanding its partnership with the U.S. General Services Administration (GSA) through its Region 3 General Construction Multiple Award IDIQ contract. We are excited to announce several new task order awards encompassing a diverse range of construction services, including structural concrete repairs, waterproofing and building envelope improvements, fire alarm and life safety system upgrades, mechanical system replacements, emergency power infrastructure improvements, and security barrier enhancements. 

​

• Emergency Generator Tank & Line Replacement – Silver Spring, MD

Design-build replacement of the emergency generator fuel storage tank and associated piping at Silver Spring Metro Center 1, including installation of a new 500-gallon aboveground storage tank, fuel line upgrades, system connections, testing, and commissioning.

 

• EST Fire Alarm Panel & Controllers Replacement – Suitland, MD

Replacement and upgrade of 18 fire alarm control panels from EST-3 to EST-4 systems at the 4600 Silver Hill Road North and South buildings, including associated control equipment, programming, electrical modifications, testing, and system acceptance.

 

• DOT Headquarters Fire Alarm System Upgrade – Washington, DC

Upgrade of the fire alarm system at the U.S. Department of Transportation Headquarters West Building, including replacement of obsolete fire alarm control panel equipment, system programming, electrical modifications, testing, and commissioning to improve fire protection and life safety.

​

• Muirkirk Water Source Heat Pump Replacement – Laurel, MD

Design-build replacement of aging water source heat pump systems at the Muirkirk Campus, including mechanical system upgrades, associated infrastructure modifications, and phased construction to maintain continuous facility operations and improve energy efficiency and occupant comfort.

​

• Replace Bollards & Temporary Active Vehicle Barriers – Washington, DC

Replacement of existing hydraulic bollards and temporary vehicle barriers at the E. Barrett Prettyman Federal Courthouse and William B. Bryant Annex, including installation of new hydraulic barrier systems, associated electrical and control systems, concrete reconstruction, drainage improvements, and traffic control modifications.

​

• Waterproofing Infiltration Construction – Washington, DC

Waterproofing improvements at the historic Herbert C. Hoover Building to address persistent water infiltration issues affecting the courtyard plaza and underlying building spaces.

​

• OWFN Plaza Level Column 9 Expansion Joint Repair – Bethesda, MD

Expansion joint and concrete repairs at the One White Flint North Building to address water infiltration from the plaza level and prevent further deterioration of the underlying parking garage.

​

• Department of Energy Urgent Column Repair – Washington, DC

Structural concrete column repairs at the James Forrestal Complex, addressing deteriorated columns at the basement, parking, and ground-floor levels to restore structural integrity and support continued facility operations.

​

• DOT HQ Moveable Bollard Replacement – Washington, DC

Replacement of hydraulic security bollards and associated equipment and controls at the Department of Transportation Headquarters' East Building loading dock, enhancing vehicle access security and perimeter protection while maintaining operations at the occupied federal facility.